Reviewing a drilling contractor / operator well control procedures for a client for performing a volumetric well kill my impression is that they largely fail to address the hydrostatics and flow behaviour that differentiate subsea BOPs from surface BOPs. I would be extremely interested to hear from anyone who has procedures that they feel do work with long choke line(s)